Company News

Tianjin Ruide Steel Pipe Manufacturing Co., Ltd.
building construction steel pipe,welded structural pipe,large diameter water pipeline

Daily Production Scheduling Form (Dec 1,2025)

Date:2025-12-01
Daily Production Scheduling Form

Date: December 1, 2023
Document No.: PS-20231201-EN

1. Production Status & Available Specifications (As of Today)
The following square pipe specifications are currently available for scheduling on the production line:

Item Specification (mm) Material Standard
01 20 x 20 ASTM A500 Gr. B
02 40 x 40 ASTM A500 Gr. B
03 30 x 50 ASTM A500 Gr. B
04 50 x 50 ASTM A500 Gr. B
05 40 x 60 ASTM A500 Gr. B
06 20 x 40 ASTM A500 Gr. B
07 30 x 30 ASTM A500 Gr. B
08 20 x 30 ASTM A500 Gr. B

09 25 x 50 ASTM A500 Gr. B


2. Production Capacity & Lead Time Commitment

Standard Lead Time: 3 working days upon order confirmation.
Scheduling Basis: Production slots are allocated based on "First-Come, First-Served" according to the official order receipt time.
Inquiry & Order: All inquiries and orders for the above specifications are welcome. Custom sizes not listed can be inquired separately for feasibility and lead time.

3. Notes for Scheduling

This schedule is based on real-time production line status and is subject to change. Please confirm availability with our sales team before placing an order.
The 3-day delivery commitment commences after final order confirmation, completion of all pre-production procedures, and receipt of cleared payment (if applicable as per terms).
For urgent orders or large quantities, please contact us directly for priority scheduling arrangements.
info@rd-steel.com

Recommended

  • building construction steel pipe,welded structural pipe,shs square hollow sections
    Ductile Iron pipes and fittings are increasingly recognized as a preferred material in modern construction and infrastructure projects due to their outstanding performance and long-term benefits
  • api 5l gas welded pipe procurement,construction welded pipe
    Galvanized welded pipes are widely used in construction,transportation,and agriculture,but their zinc coating often wears down quickly under abrasive conditions,This article explores practical methods to enhance their durability,focusing on coating upgrades and base material improvements,
  • construction steel pipe supplier,high-strength piling pipe,api 5l steel pipe piles
    Your Trusted Partner in PPGI, GI Coil & HR Coil Supply Across Southeast Asia!At TIANJIN RUIDE STEEL PIPE MANUFACTURING CO., LTD, we take immense pride in being a leading supplier of high-quality PPGI (Pre-Painted Galvanized Iron), GI Coils (Galvanized Iron Coils), and HR Coils (Hot-Rolled Coils)
  • Zinc Coating Defects in Galvanized Tubes
    Key Causes of Omission Plating in Galvanized Pipes: Grease on base pipe – prevents proper adhesion,leading to uneven coating and black marks,Surface corrosion – residual iron oxides block zinc contact,causing pitting,Heavy stains or grease – difficult to remove,resulting in localized omission plating with smoother edges,Scratches and rough surfaces – contaminants trapped in grooves,causing long,narrow defects (rare),Insufficient galvanizing temperature – leads to leakage issues in the finished pipe,
  • galvanized round pipe
    As a trusted galvanized pipe manufacturer exporter,we supply high-quality galvanized pipes for global infrastructure,municipal and agricultural projects,Currently,the Strait of Hormuz maritime logistics disruptions have caused vessel delays and increased costs for galvanized pipe export to the Middle East,However,we remain optimistic about the global galvanized pipe market prospect,as the global infrastructure boom drives steady demand,We proactively share uncontrollable logistics costs with clients,embodying corporate responsibility and mutual trust,This summary highlights our commitment to partners amid trade uncertainties,emphasizing Middle East galvanized pipe trade,maritime logistics resilience,and our dedication to quality and cooperation,May world peace and smooth global trade prevail,